Overview

  • Services EV charger installation
  • Industry Schools

Schneider EVlink Pro

Perdaman Advanced Energy (PAE) was awarded the tender for the supply, and installation of Electric Vehicle (EV) Charging Station at the TAFE Campus.

Following a detailed assessment of the client’s operational and energy requirements, PAE designed and implemented a comprehensive solution consisting of four 22 kW EV charging stations. The selected system features EVlink Pro AC chargers from Schneider Electric, renowned for their efficiency, reliability, and smart connectivity. The EVlink Pro AC Metal Charging Station offers a versatile and durable configuration, suitable for wall- mounted or floor-standing installations with one or two charge points.

For this project, the floor-standing dual socket configuration was adopted allowing charging of simultaneous vehicles on one charging station. Each unit was securely mounted on a Schneider-manufactured pedestal within a protective metal enclosure to ensure safety, accessibility, and longevity.

The EVlink Pro AC chargers provide advanced operational features including:

  • Load management capability for optimized power
  • Charge detail recording for usage tracking and data
  • Diagnostic and fault detection functions for proactive
  • RFID Compatibility to enable user access control and secure

Characteristics

Product Type

3 Phase AC Charger
Socket Number

2 Sockets:
Floor Standing Version

Power

4 X 22 kW

To ensure seamless integration with site power infrastructure, PAE incorporated the EcoStruxure, EV Charging Expert by Schneider Electric. The controller facilitates real- time monitoring and dynamic load management, automatically allocating available energy among connected chargers while preventing system overloads. The Eco Struxure system can effectively manage up to five EV chargers under the current configuration. Future system expansion can be easily achieved through a firmware upgrade, providing a scalable and future-ready solution.