99.7 kWp / 100 kVA SOLAR PV ROOF-MOUNTED SYSTEM
4 Stephen St, Bunbury WA 6230
Perdaman Advanced Energy (PAE) was awarded the tender to design and install a 99.7 kWp / 100 kVA solar PV system for the City of Bunbury’s Administration Building. The system features 210 high-efficiency Jinko Solar 475 W panels, integrated with a robust Fronius Tauro ECO 100-3-D inverter, providing reliable and scalable renewable energy to support the City’s sustainability goals.
Equipment Used
- 210 x 475W Jinko Solar Panels
- 1 x Fronius Tauro ECO 100-3-D
Challenges
Similar to other high-rise installations, craning was required to load materials on to the roof for the installation. This was meticulously planned and implemented during non-operational hours ensuring all safety requirements were met. The installation was also coordinated with the patrons of the Administration Building ensuring minimal disruption. The new system is expected to significantly offset daytime electricity consumption, reduce greenhouse gas emissions, and contribute to the City’s broader sustainability and carbon reduction targets.
Outcome
Perdaman Advanced Energy (PAE) successfully completed the design and installation of a 99.7 kWp / 100 kVA rooftop solar PV system for the City of Bunbury’s Administration Building. This installation marks a continued commitment from both the City of Bunbury and PAE toward a cleaner and more resilient energy future.